7 - 8 November 2012NEC Birmingham
Melville Order Forms

Orders received after October 5th 2012 will be subject to a 20% surcharge
| Electrical and Grid Plan Order form |
| Carpet and Furniture Order form |
|
Shell Scheme Extras Order form To fix to the shell scheme, the following methods can be used: Velcro – the shell scheme is smooth so you will need both sides. Double sided sticky pads ‘S Hooks’ over the top of the shell scheme |
| Nameboard form (shell sign fascia) |
| Octanorm Shell Brochure |
CLICK HERE - MELVILLE
|
For any other queries, please contact:
Hannah Merry - Event Manager - ON BEHALF OF Melville
Email: hannah.merry@melville.co.uk
T: +44 (0) 844 8793 226 / T: +44 (0) 2476 380180 (Non UK)
F: +44 (0) 2476 380 220
If space has been booked with shell/carpet/electric, this will be installed by Melville.
If there is a requirement for any electrical point or spotlights to be moved, this will be undertaken on Set-up day 6.11.11 by Melville.
Spotlights will be fitted as standard behind sign fascia and electrical socket low level on back wall.
If any re-positioning is required, please use electrial grid form, complete and return to Hannah Merry
DO’S & DON’TS
Please observe the do’s and don’ts associated with the shell Octanorm system.
PLEASE NOTE:
Melville will be available to assist with any late requirements( if available) - on Tuesday 6th November - until 5pm.
CLEANING - GENERAL AREAS /SPECIALIST CLEANERS
For all shell scheme ordered - Melville will set-up, clean walls.
There will be a pre-clean prior to the event opening of the hall and stands. All waste material - other than waste caused by demonstrations, etc, will be removed from the hall by the NEC on set-up - Tuesday 8th November.
The NEC will undertake a general daily clean of the aisles and stands, this does not include cleaning equipment or displays on stands. If there is an extra requirement, this can be booked with the NEC directy at an extra charge.
Specialist Stand Cleaning: Specialist cleaning for stands can be booked direct with ISS – telephone 0121 767 2524 - who will be on site during build.
All waste products must be removed from the hall on dismantle.
NB: Displays exceeding 4m height that are put together/assembled on site that are classed as' Complex structures'.
PLEASE SEE HEALTH AND SAFETY (eGuide)
If assistance is required with reference to 'space only' bookings, ie. dimensions, ceiling height, etc - please contact Karena Quinn - Karena.Quinn@thenec.co.uk who will be able to advise accordingly.